欢迎来到三一文库! | 帮助中心 三一文库31doc.com 一个上传文档投稿赚钱的网站
三一文库
全部分类
  • 研究报告>
  • 工作总结>
  • 合同范本>
  • 心得体会>
  • 工作报告>
  • 党团相关>
  • 幼儿/小学教育>
  • 高等教育>
  • 经济/贸易/财会>
  • 建筑/环境>
  • 金融/证券>
  • 医学/心理学>
  • ImageVerifierCode 换一换
    首页 三一文库 > 资源分类 > PDF文档下载  

    IEEE-485-INT-1-2008.pdf

    • 资源ID:3770900       资源大小:84.51KB        全文页数:3页
    • 资源格式: PDF        下载积分:2
    快捷下载 游客一键下载
    会员登录下载
    微信登录下载
    三方登录下载: 微信开放平台登录 QQ登录   微博登录  
    二维码
    微信扫一扫登录
    下载资源需要2
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    IEEE-485-INT-1-2008.pdf

    The specific designation of the standard, including the year of publication: IEEE Standards Interpretation for IEEE Std 485 -1997 IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications Copyright © 2008 by the Institute of Electrical and Electronics Engineers, Inc. Three Park Avenue New York, New York 10016-5997 USA All Rights Reserved. This is an interpretation of IEEE Std 485-1997. Interpretations are issued to explain and clarify the intent of a standard and are not intended to constitute an alteration to the original standard or to supply consulting information. Permission is hereby granted to download and print one copy of this document. Individuals seeking permission to reproduce and/or distribute this document in its entirety or portions of this document must contact the IEEE Standard Department for the appropriate license. Use of the information contained in this document is at your own risk. IEEE Standards Department Copyrights and Permissions 445 Hoes Lane Piscataway, New Jersey 08855-1331, USA December 2008 Interpretation Number 1 Relevant Clauses: 4.1 and 4.2.3 Interpretation Request #1 This is a request for interpretation of IEEE 485-1997 centering on the section on Momentary Loads (Section 4.2.3) in IEEE Std 485-1997 which basically states, “the voltage drop after several seconds often determines the battery's 1 min rating.“ The previous statement is related to an additional statement in the same section that reads, http:/standards.ieee.org/reading/ieee/interp/485-1997.html (1 of 3) 2009/01/06 7:20:55 PM Copyright The Institute of Electrical and Electronics Engineers, Inc. Provided by IHS under license with IEEELicensee=HP Monitoring/1111111164 Not for Resale, 02/06/2009 02:38:25 MSTNo reproduction or networking permitted without license from IHS -,-,- The specific designation of the standard, including the year of publication: “Sizing for a load lasting only a fraction of a second, based on the battery's 1 min performance rating, results in a conservatively sized battery.“ This has caused some of our engineers to use the peak draw of the DC motor current, i.e. 81 amps, instead of the steady state current of 30 amps, to recommend a battery that is much much larger than anything we have previously used on our system. The 81 amps only lasts for about .06 seconds. The 81 amps is the lab tested draw of the DC motor and it would be expected that this value to be less under field conditions where long leads to the motor consist of lead resistance not used to compute the 81 amps in the lab. Since it is the 1 minute rating which is needed to size the battery and after several seconds, the 1 minute rating is determined, would you agree to take the average current over the first 2 or 3 seconds to determine the 1 min rating? If you feel that possibly 2 or 3 seconds is excessive, then perhaps the average current over 1 second to show a more conservative approach? It is also my understanding that these large voltage draws from the battery may initiate the coup de fuote of the battery and perhaps this is why there is such a conservative recommendation in IEEE Std 485-1997 for the 'fraction of a second' reference as noted in the second paragraph above. Our batteries feed substation relays and are not used for any generator type control systems where sensitive battery voltage drops will adversely effect the function of the protective relays. Any information you can provide would be helpful. Interpretation Response #1 Your question relates to the use of inrush / peak currents (especially those that only last for less than 1 second). You asked if “Since it is the 1 minute rating which is needed to size the battery and after several seconds the 1 minute rating is determined, would you agree to take the average current over the first 2 or 3 seconds to determine the 1 min rating?” and “If you feel that possibly 2 or 3 seconds is excessive, then perhaps the average current over 1 second to show a more conservative approach?” Subclause 4.2.3 of IEEE Std 485-1997 states that “Although momentary loads may exist for only a fraction of a second, it is common practice to consider each load will last for a full minute because the battery voltage drop after several seconds often determines the batterys 1 min rating.” In 4.1, it also states “The most severe of these conditions, in terms of battery load and duration, should be used to determine the battery size for the installation.” The document does not support averaging of loads over any time period, but as noted within 4.2.3 you may consult http:/standards.ieee.org/reading/ieee/interp/485-1997.html (2 of 3) 2009/01/06 7:20:55 PM Copyright The Institute of Electrical and Electronics Engineers, Inc. Provided by IHS under license with IEEELicensee=HP Monitoring/1111111164 Not for Resale, 02/06/2009 02:38:25 MSTNo reproduction or networking permitted without license from IHS -,-,- The specific designation of the standard, including the year of publication: the battery manufacturer for ratings of discharge durations less than 1 minute. You also note in your request that the current values measured in the laboratory may be higher than those found in the field due to, as a minimum, the resistance in the cable to the loads. The standard does not specify in what manner load currents be determined, but it is acceptable to utilize current values that reflect actual conditions in the field, as long as the considerations of 4.1, discussed above, are considered. Back to Available IEEE Standards Interpretations Online © Copyright IEEE-SA Contact IEEE-SA For questions or comments, please contact the IEEE-SA Webmaster. http:/standards.ieee.org/reading/ieee/interp/485-1997.html (3 of 3) 2009/01/06 7:20:55 PM Copyright The Institute of Electrical and Electronics Engineers, Inc. Provided by IHS under license with IEEELicensee=HP Monitoring/1111111164 Not for Resale, 02/06/2009 02:38:25 MSTNo reproduction or networking permitted without license from IHS -,-,-

    注意事项

    本文(IEEE-485-INT-1-2008.pdf)为本站会员(哈尼dd)主动上传,三一文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一文库(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    经营许可证编号:宁ICP备18001539号-1

    三一文库
    收起
    展开