最新交大附中人教版七年级地理下册期末试题及答案名师优秀教案.doc
《最新交大附中人教版七年级地理下册期末试题及答案名师优秀教案.doc》由会员分享,可在线阅读,更多相关《最新交大附中人教版七年级地理下册期末试题及答案名师优秀教案.doc(25页珍藏版)》请在三一文库上搜索。
1、交大附中人教版七年级地理下册期末试题及答案securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fi
2、re equipment; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic perso
3、ns, shall participate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams . Eight, pr
4、ovided by the General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written pro
5、cedures for acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing pr
6、ocedures, develop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the sub-contractor for scaffolding, construction site facilities,
7、equipment safety protection facilities, safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mec
8、hanical operations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts. Hoisting personnel must abide by hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equip
9、ment is strictly prohibited and unauthorized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, fire-fighting equipme
10、nt are not allowed to divert it. Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn provisions, prohibited the use of furnaces. Construction such as open flame heating measures must be used, you should obtain the co
11、nsent of General fire交大附中七年级地理下册期末质量检测试卷 题号 一 二 三 四 五 总分 分数 一、选择题(每小题只有一个选项符合题意。每题2分,共40分) 1.亚洲在世界中的位置,描述正确的是: ( ) A、全部位于东半球、北半球 B、全部位于西半球、南半球 C、主要位于东半球、北半球 D、主要位于西半球、南半球 2( 亚洲气候复杂多样的根本原因是 ( ) A(亚洲面积广大 B. 亚洲三面环海 C. 亚洲南北跨度大 D. 亚洲纬度范围广,海陆跨度大 3(关于亚洲地形地势的描述,正确的是: ( ) A、中部地势高,四周地势较低 B、以高原地形为主,山地、平原、盆地 C、
12、东西部高,中部低 D、以平原地形为主,山地、高原、盆地极少 4. 有关日本地理特征的叙述,正确的是 ( ) A(日本是太平洋东部的群岛国家 B(日本境内多平原,平原面积占国土总面积的四分之三 C(气候冬暖夏凉,为典型的温带海洋性气候 D(日本的铁矿、石油、煤炭等矿产资源贫乏,绝大部分依赖进口 5(能给印度带来大量降水的是 ( ) A(东南季风 B. 西南季风 C. 东北季风 D. 西北季风 6(中日文化交流源远流长,日本文化深受中国影响,突出表现在( ) A(语言和文字方面 B. 建筑和文字方面C. 语言和建筑方面 D. 文字和农业技术方面 7(世界上惟独占有一块大陆的国家是 ( ) A(新西
13、兰 B. 英国 C. 日本 D. 澳大利亚 8(日本占绝对优势的民族是 ( ) A(蒙古族 B. 朝鲜族 C. 高山族 D. 大和族 9(美国“硅谷”最重要的工业部门是 ( ) A(电子工业 B. 汽车工业 C. 钢铁工业 D. 宇航工业 10(世界最寒冷的地区是 ( ) A(北极地区 B. 西伯利亚 C. 南极地区 D.青藏高原 11.登艾菲尔铁塔,在罗浮宫欣赏名画蒙娜丽莎应该去 ( ) A德国 B、英国 C、法国 D、奥地利 12. 被伊斯兰教、基督教、犹太教看作圣地的是 ( ) A、麦加 B、贝鲁特 C、耶路撒冷 D、大马士革 13. 不使用欧元的国家是 ( ) A、法国 B、德国 C、
14、英国 D、俄罗斯 securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment
15、; When transporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall pa
16、rticipate in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams . Eight, provided by th
17、e General machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for
18、acceptance and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, de
19、velop safe use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the sub-contractor for scaffolding, construction site facilities, equipment sa
20、fety protection facilities, safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical oper
21、ations, special operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts. Hoisting personnel must abide by hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is stri
22、ctly prohibited and unauthorized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, fire-fighting equipment are not a
23、llowed to divert it. Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn provisions, prohibited the use of furnaces. Construction such as open flame heating measures must be used, you should obtain the consent of Gen
24、eral firesecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 最新 交大 中人 教版七 年级 地理 下册 期末 试题 答案 名师 优秀 教案
链接地址:https://www.31doc.com/p-1330824.html