最新[小学+二年级数学]小学生二年级应用题口算笔算题优秀名师资料.doc
《最新[小学+二年级数学]小学生二年级应用题口算笔算题优秀名师资料.doc》由会员分享,可在线阅读,更多相关《最新[小学+二年级数学]小学生二年级应用题口算笔算题优秀名师资料.doc(43页珍藏版)》请在三一文库上搜索。
1、小学 二年级数学小学生二年级应用题口算笔算题detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher tha
2、n hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when
3、 pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 1
4、1, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 c
5、onstruction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, the
6、re should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury,
7、in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review
8、the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carrie
9、d out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site . 4-2-1 construction
10、 organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety小学 二年级数学小学生二年级应用题口算笔算题 16,27
11、, 222, 298, 388, 2?1,0, 50,28, 6?2,2, 56,82, 85,83,1, 86,79, 14,11,25, 90,81,2= 96,24, 52,15, 424?4, 19,66, 13,63, 77,66,49, 750= 25?59, 570?10, 20?5,37, 04,62, 18,7, 63,16,16, 80,57, 51,30,5, 547, 940?10, 45,91,29, 72,25?5, 43,0, 60?6,29, 36,16, 51,7,57, 64,19, 73,24?3, 30,48, 46,91,80, 60?10,99, 1
12、2?2,2, 71,9= 56,44,8, 10?17, 28?4,83, 12?4,2, 422, 790?9, 97,7,66, 60?6,7, 827?9, 81?9?1, 10?18, 30?10,1, 76,57,79, 37,15, 90,97, 32?2?2, 95,57,44, 53,41, 4,48, 34,44, 516?8, 92,62, 22,32,97, 936?9, 8?8,0, 168?3?7, 46,11, 36?9,69, 0,60,36, 13,88, 035?7, 24,5?5, 47,98, 42?6,4, 62,10?1, 96,23, 3,58,67
13、, 79,38,40, 70?105, 35?5,31, 93,22,34, 10,63?9, 63,62,0, 20?5,3, 47,32, 115,95, 94,10, 60,72?8, 84,22, 21,23, 10,0, 13,71,38, 16?1?8, 62,44, detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals th
14、e excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the r
15、igid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified fo
16、r acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit
17、of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operatio
18、ns; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project man
19、ager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on
20、, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electr
21、ical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations
22、, acceptance or unqualified acceptance not made the next processes work; 10, the construction site . 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging
23、 holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safetydetection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to
24、 dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miners lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 小学+二年级数学 最新 小学 年级 数学 小学生 应用题 口算 笔算 优秀 名师 资料
链接地址:https://www.31doc.com/p-1399913.html