1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this
2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th
3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf
4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o
5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr
6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements
7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and
8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and
9、 rain protection measures. 4. each electrical device must have a machine, a gate, a leak and a box System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a
10、 temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or
11、on scaffolding erected temporary power lines. 6. underground lines must be installed to the flag and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places
12、 such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Ministr
13、y archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to furt
14、her strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance wit
15、h law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system applicat
16、ion of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application i
17、nformation system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employ
18、ees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity
19、of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-s
20、aving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedbac
21、k of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhan
22、ce employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model ro
23、le; to continues to strengthening four good leadership construction, full play levels cadres in enterprise development in the一、编制依据1、xx河改道段整治工程施工图纸;2、有关技术及安全操作规范;4、施工现场实际情况及我单位类似工程施工经验。二、工程概况 根据规划要求改道,从月季路东侧沿路向北延伸至后塘河。改道段全长约0.32KM。河道为新开河道,河道断面采用标准断面,两侧新建驳岸,驳岸采用钢筋砼挡土墙,河底高程均1.5米,驳岸顶高程为5.5米,河底宽6米,边坡1:3
24、,驳岸口宽为15米。三、河道开挖施工方案1、测量放线:工程施工测量定位由测量队实施,测量队内部建立完善的测量、复核、记录制度,标高测量应由跟随挖土的全过程以免超挖。按照图纸标示的桩位,用全站仪测量出中心点位和边坡开挖线,再用水准仪测量地面标高,计算出开挖深度,用木桩标示。2、地面清表:根据测量的结果,对红线范围内的表面附着物进行清理,先用挖掘机对大型苗木、施工障碍物清理,然后用推土机进行整理,为下一步机械化施工做好准备。3、沟塘清淤:对沿线的水塘进行摸底调查,挖排水沟,临时排入老三八河道中,排不完的用水泵抽干。用挖掘机将淤泥清理后装车外运弃置。4、土方挖运:本河道为新建,按甲方要求所出土方部分
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- dxx 改道 施工组织设计
链接地址:https://www.31doc.com/p-2037123.html