ok年产4万吨三氯乙烯项目可行性研究报告(1).doc
《ok年产4万吨三氯乙烯项目可行性研究报告(1).doc》由会员分享,可在线阅读,更多相关《ok年产4万吨三氯乙烯项目可行性研究报告(1).doc(104页珍藏版)》请在三一文库上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .目录1总论11.1概述11.2研究结论32市场分析及价格预测72.1产品性状及用途72.2国
14、内、国际市场的分析及价格预测73生产规模、总工艺流程及产品方案133.1三氯乙烯装置的生产规模及产品方案133.2装置操作时间133.3产品、副产品规格133.4关于产品方案国家与行业的政策、法规要求153.5生产规模确定的原则和理由154工艺装置技术方案154.1工艺技术方案的选择154.2工艺说明174.3主要原材料消耗定额及消耗量204.4自动控制214.5主要设备的选择235原料、辅助材料及动力的供应285.1主要原材料、辅助材料及动力的规格及供应285.2公用工程的规格及供应286建厂条件和厂址方案316.1建厂条件316.1.1厂址的地理位置、地形、地貌概况316.2厂址方案327
15、公用工程和辅助设施方案347.1总图运输347.2给水、排水377.3供电及电讯407.4供热427.5贮运设施及机械化运输437.6工厂外管网457.7空压站、氮气站、冷冻站467.8采暖通风与空气调节477.9分析化验477.10土建工程488节能508.1能耗指标508.2节能措施综述509环境保护519.1执行的环境质量标准及排放标准519.2主要污染源及污染物519.3环境保护与综合利用论述529.4环境保护费用5310安全技术专篇5410.1安全技术专篇5411消防技术专篇6211.1设计原则、依据及规范6211.2火灾危险类别6311.3消防措施和设施6412企业组织和定员661
16、2.1管理体制6612.2装置定员6612.3人员培训6613项目实施计划6813.1项目实施阶段6814投资估算及资金筹措6914.1投资估算6914.2资金筹措7015技术经济分析7115.1项目概况7115.2编制依据7115.3生产成本费用估算7115.4财务评价计算及主要参数7215.5财务评价计算分析7315.6财务评价结论74Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department spee
17、ch contest, failed to get a good result, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom a
18、gain. For the class out of a force. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the De
19、partment, thanks to instructor teachers good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five dec
20、larations of good party branch branch is a fortress, a party member is a banner. Fighting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, th
21、e branch closely around the construction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the pr
22、oject began, Headquarters Branch is tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requiremen
23、ts all members lead, encouraged colleagues Zhijian each other help, each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role.
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ok 年产 三氯乙烯 项目 可行性研究 报告
链接地址:https://www.31doc.com/p-2129636.html