1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,
3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8
4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe
5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207
6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo
7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc
8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F
9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ
10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis
11、ion of production safety and the Olympic Games and other施工组织设计工程名称:工程建设集团有限公司目 录基本情况及会签1工程概况5施工部署11施工平面布置图13施工准备工作14主要项目施工方法23质量保证措施53安全技术措施57技术节约措施64冬季施工措施66雨季施工措施68主要材料用量70技术经济指标71附录72施工组织设计补充74附表:施工进度计划表附图一:深基坑挡土支护结构平面示意图附图二:深基坑挡土支护结构剖面示意图附图三:降排水系统平面图附图四:吊模施工示意图附图五:地下室墙模板支撑图附图六:外脚手架搭设形式基 本 情 况 工程
12、名称:6#、7#楼及地下车库17至39轴(B段)工程地点:建设单位:设计单位:总包单位:监理公司:监督单位:开工时间:年11月20日施工单位会签表1生产负责人技术负责人项目经理上岗证号项目副经理上岗证号项目副经理上岗证号项目工程师上岗证号土建工长上岗证号水、暖工长上岗证号钢筋工长上岗证号电气工长上岗证号质量员上岗证号技术员上岗证号资料员上岗证号预算员上岗证号器材员上岗证号主持编制人编制完成日期审核负责人审核日期公司领导会签表2总工程师生产经理总经济师建设单位及监理表3建设单位监理单位公司部门审核会签(一)表4部门审 核 意 见审核人及部门签章生产计划部门业务经营部门技术部门质量部门公司部门审核
13、会签(二)表5部门审 核 意 见审核人及部门签章安全技术部门劳动部门器材设备部门财务部门工程概况(一)表6工 程 名 称6#楼工程详细地址工程座落位置示意图单位工程质量指标建筑面积10716.25m2平面形式凸字形结构类型框架异型柱工程性质住宅楼基础类型筏板式基础基础标高3.900m基础埋深5.3m地下防水类型SBS改性沥青卷材防水承重墙类别及厚度现浇混凝土墙,外墙300mm内墙200mm楼板类别及厚度现浇混凝土楼板厚度250 mm 100 mm屋面防水类型SBS改性沥青卷材防水采暖煤气及弱电设备商品房标准开工日期年11月20日竣工日期年6月层 数层 高(m)地下地上设备层负一层首层标准层顶层
14、设备层1243.95.13.153.53工程概况(二)表7工 程 名 称7#楼工程详细地址工程座落位置示意图单位工程质量指标建筑面积10838.16m2平面形式人字形结构类型框架异型柱工程性质住宅楼基础类型筏板式基础基础标高3.900m基础埋深5.2m地下防水类型SBS改性沥青卷材防水承重墙类别及厚度现浇混凝土墙,外墙300mm内墙200mm楼板类别及厚度现浇混凝土楼板厚度250 mm 100 mm屋面防水类型SBS改性沥青卷材防水采暖煤气及弱电设备商品房标准开工日期年11月20日竣工日期年6月层 数层 高(m)地下地上设备层负一层首层标准层顶层设备层1243.94.83.153.6工程概况(
15、三)表8工 程 名 称地下车库B段工程详细地址工程座落位置示意图单位工程质量指标建筑面积3658m2平面形式平面凹凸形结构类型现浇混凝土工程性质车库基础类型阀板基础基础标高6.15m基础埋深6.55m地下防水类型SBS改性沥青卷材防水承重墙类别及厚度现浇混凝土墙,外墙300mm内墙200mm楼板类别及厚度现浇混凝土楼板厚度250 mm 100 mm屋面防水类型SBS改性沥青卷材防水采暖煤气及弱电设备商品房标准开工日期.11.20竣工日期.4层 数层 高(m)地下地上设备层负一层首层标准层顶层设备层13.8m 工程概况(四)表9基础埋置深度6#楼5.3m、7#楼5.2m地下车库6.55m大体积混
16、凝土基础厚度6#楼1.4m 、7#楼0.5m地下车库400mm大体积混凝土强度等级6#楼、7#楼C40地下车库C30大体积混凝土抗渗等级S8大体积混凝土类型供货单位商品混凝土混凝土分公司深基放坡坡度1:1挡土支护结构基坑钢板桩加拉锚工程桩类型施工单位预应力混凝土管桩、混凝土方桩深基坑挡土支护结构平面示意图(详见附图1)深基坑挡土支护结构立面示意图(详见附图2)注:用于基坑东侧25m处工程概况(五)表10工 程 测 量建筑红线控制桩坐落位置及示意图给定水准点高程及位置示意图原场地平均标高(m)绝对标高2.7m设计室外绝对标高(m)6#楼3.85 7#3.80设计首层地面绝对标高(m)6#楼4.3
17、5 7#4.30室内外高差 (m)0.500m工程概况(六)表11环 境 状 况相邻建筑物状况该建筑位于地内。建筑南侧为拟建建筑,即7#楼;建筑北侧为施工临时道路,建筑西侧距河仅为30m米,建筑东侧为施工临时道路和拟建建筑,施工现场较平坦开阔。红线内地下埋藏物及管线状况本场地原为荒地,局部有坑塘,后经人工填垫至现地坪,现地坪基本平坦。地下除布满杂填土和部分地区有淤泥外无任何埋藏物及管线。地表水状况及排除方法场地表面局部有击水,地表层1.4m以下见水,采取拟建建筑物周围明沟及集水井排水,并在基坑平面内纵横间隔20m设管井,井深8米,进行降水。施工部署(一) 表12总体安排施工方式基础主体装修流水
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- rz6 、7 楼及地下车库17至39轴B段组织设计 地下 车库 17 39 组织设计
链接地址:https://www.31doc.com/p-2133422.html