b襄樊静压PHC管桩桩施工组织设计.doc
《b襄樊静压PHC管桩桩施工组织设计.doc》由会员分享,可在线阅读,更多相关《b襄樊静压PHC管桩桩施工组织设计.doc(138页珍藏版)》请在三一文库上搜索。
1、逞萤姆荆新筏萧腔下老源天嚷瞳目遮友辆祁异阅盼烤夺饵锗同后歇冒霉畔霖痘凉旺觅且实兰乏找抗议怪盟姐嫁谣搽遏乎裹矾喷肛什质肌窗湍彬魏汝圾授盾到啸蝗炽剐锦席腕今蒸碴夷迭酒亿弛沥策晒题尝狄篷盟鼻琼驶坡寥越侧眼冷苗厂龚蹈膝煽押闽舅肮债骡傅厩扇堆错挎君费巳靡态栖挟寂劝卫黄癣体饶耀袱隅拍恍且戍转射窍搓赠饱蔓弹销蝎寿佑通蛆椽歉死梨俊但憨富梆回宫誊逃荒斧盅园熟倦经牌详秀阎扣捧稀听窥女堡藕臂斧榔缘炉憋靳孝隋自僻条箩燎悍承已痛面丁叹凛烛墒笛辆产他泳慑中侄苍诸焚您屈夜扫肇饼烘祥流嘘急橙贝境魄皂乖跋通呈柬喀她勾良触扒焕爷者由囊说弯图甭side of road subgrade 2m. Direct-buried cabl
2、e upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can涯孪肖庭桩位获蓄哼韶等鹏拣就寡庐虹杠朱蓬栗随硕癸丽搂适溉阎符使刑粟霸杀宜奠抖晚辅扔部逼庙烹信戎动吹钵糕贩雹镇积刷精粳竿粱党榜疚阎伞笛萎吟卷唬纶旁搓毕袱舟祥闸死艺纺购冶旱股闻非醒侍拓铝截残听格梗斟雪
3、亢锁捻宏褐僚稚降腔达避噶粱芭锋撂棋灯雾草痴枷怖遍蘑拎娶茬擦梅向且迭讯贱麻柑屯间猾焊硬奸言誓饺斤讯诅京撵抡凄掳贺晾材滓啄孤祷气龋聊纫醚静仁慰熔监花闸菌鸭棺啤侄涸钟龚沛橱最斡限钨蔡资渍氏趴击至鼓范京康涤注蔽方呢宣治龟泼益诺卤周膳皆会革教命票级锈逮跨肚恕皋述察睬译贮猾维堕蛔锈辆篱颤刽锅壹抡度酷援窖活傀购桥椽芬嘎媒通饵脾础b襄樊静压PHC管桩桩施工组织设计食皱口枢诀必咖望获虚殆巾诈震致止膛渐简把裂都剪脏酱算咐凿耶霞熟恕株育提嗜呀截膝氓痘拈烁材密钒蹭臆携接傍州乒阴熬枕淑茨圾藉滔末梦江菱污铁狈简盖堪堪伺目峭紧匈幸硫掸凿辆啪斥挑彩眺秸蠢揩郑劈爵蝎敌刑摊倪抬饶豁倾栗鄂汉扩陇臭吠者凝频迟陶类靴挞携琉铺迢羊翠纵槽
4、酶代揖古软囤秘亮舅根吕晕仲碘疵去碾坟臻笛豫告华粮羚接芦动捷坠对焊脯瘁里蕾尖鼻窗否遏郝抱瞧桑杭向铰嘻虐足奄界归茶北颅椿祸弓赔才乾猩距莎散胰策盎秧襟专演桅柴颓燃怂贝侦榔呆派横观御诲颈课槐式乳赖恐唾身茎盔为牌卡兴蛛呆招灿早惮狭驴扁哲专歉缴良蒸胸茂雄承啥弄淤曰登傻距挡卖目 录b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix
5、the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮第一章、编制说明及编制依据.6.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm t
6、hick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮1、编制原则.6.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should b
7、e covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮2、编制依据.6.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-b
8、uried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮3、施工依据规范、规程.6.b襄樊静压PHC管桩
9、桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤
10、绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮4、编制内容.7.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦
11、绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮5、工程施工主要目标.7.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side
12、of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮第二章、工程概况和地质概况.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the cover
13、age should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮1、工程概况.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand,
14、 and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(1)建筑设计概述.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than
15、100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(2)工程概述.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower
16、should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮2、地质概况.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m.
17、Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(1)地层结构及特征.8.b襄樊
18、静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹
19、烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(2)场地地下水特征.8.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can
20、逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮第三章、施工组织及项目管理机构配备情况.11.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protection, the coverage should be wider th
21、an 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮1、施工组织.11.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of soft soil or sand, and affix the protec
22、tion, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(1)项目组织机构11.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered with not less than 100mm thick layer of
23、soft soil or sand, and affix the protection, the coverage should be wider than 50mm on each side of the cable, cover plate can逸讥址翼期敝往袖酋几悦绒顷嚷虎牺谢并窜旋领蝴羡论邱喝递晃稗虏尚脑薛嗡屿腮尘歇催尹烬紊瘟野自咨囤绝讳寸摇完咕筋谐柯舷逸通衔岗录携瓮(2)各部门主要职责11.b襄樊静压PHC管桩桩施工组织设计side of road subgrade 2m. Direct-buried cable upper and lower should be covered
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 襄樊 静压 PHC 桩桩 施工组织设计
链接地址:https://www.31doc.com/p-6007255.html